Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?


정답: D
설명: (DumpTOP 회원만 볼 수 있음)
How much Total Float does drafting the product manual have?


정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Select the most appropriate explanation for use of a winter/wet weather seasonal calendar for use in this project?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
What portion of Activity B is on the critical path?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following is NOT input data to the construction planning process?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which is NOT an industry-recognized methodology for quantifying critical delay?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
What is the free float for Activity F?


정답: C
설명: (DumpTOP 회원만 볼 수 있음)
How could the structural steel drawing delay have been prevented?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
The linear scheduling velocity diagram has the following two-axis:
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?
정답: B