최신 OMG-OCSMP-MBA400 무료덤프 - OMG-Certified Systems Modeling Professional - Model Builder - Advanced

Choose the correct answer
What is the forward temporal order of these development stages?
* needs analysis
* system acceptance
* system design * trade study

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
Which aspect of a MBSE-based engineering project falls outside of the scope of AP233?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Choose the coned answer.
A department director is responsible (or monitoring the system development processes in a large systems engineering company. In a few systems engineering projects, irritation developed recently between the specialists department's requirements analysts and the system engineering design team, although the methodology had been introduced a couple of years ago.
How could the director resolve this conflict?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
What distinguishes a software development methodology from a systems development methodology?

정답: E
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
A design team is applying the MARTE profile to its model to add information about timing and resources What is a best practice to provide the MARTE information to the engineers who require it?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
Which statement about working in UPDM compliance level 1 is true?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
Which statement is true regarding a typical model-based systems engineering methodology?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
Which statement is true about a method?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Choose the correct answer
Which feature needs to be added to the systems development environment to conduct a performance simulation?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)