최신 NPPE 무료덤프 - APEGS National Professional Practice Examination (NPPE)
A "letter of Intent" can be considered an enforceable contract, provided It:
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Professional members working in what province need to be aware that contract law in that province Is Cased on legislated statutes that date Pack hundreds of years?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Licensed professional members who abide by the practice standards for authenticating finalized professional documents will authenticate
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
"An engineer or geoscientist who observes unsafe, unethical, or illegal practices must take action." This statement most clearly exemplifies a professional member's
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A certain licensed professional consultant provides services to the public. In order to reduce the risk of litigation by the client, the most Important thing for the professional to do is to ensure
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
It Is prudent for self-employed, licensed geoscientists and engineers to hold professional liability Insurance to help protect them against potential claims. Liabilities resulting from which of the following actions are not likely to be covered by professional liability Insurance?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A professional member wishing to use a former employer's confidential Information:
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
The code of Ethics is established oy:
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Empowered through their respective legislative Acts, professional regulators have the ability to impose consequences on their members If they are found guilty of unprofessional conduct and/or unskilled practice.
Which of the following disciplinary penalties, imposed by a regulator against a practitioner, is not a potential consequence for such action or behavior?
Which of the following disciplinary penalties, imposed by a regulator against a practitioner, is not a potential consequence for such action or behavior?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A licensed geoscientist is responsible for evaluating the risk of seismic event (minor earthquake) In the design and planning of a horizontal exploration well. After careful analysis, the geoscientist recommends changing the wall path because It transects a significant fault. They are concerned that the horizontal well's completion could cause a minor earthquake, whereas the revised plan would not. Their manager, a licensed engineer, overrules the decision since changing the location will result in significant delays.
In this situation, which of the following initial actions best aligns with the geoscientists professional duties?
In this situation, which of the following initial actions best aligns with the geoscientists professional duties?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)