최신 NCSC-Level-1 무료덤프 - Nutanix Certified Services Consultant (NCSC): Level 1
While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.
What would cause this warning to be issued?
What would cause this warning to be issued?
정답: C
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?
Which configuration is causing this issue?
정답: D
A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
정답: B
Where in the Support Portal is the Best Practices guide for vSphere Networking located?
정답: C
What is the minimum number of nodes required for a Nutanix Cluster to support Replication Factor 3 (RF3) on a storage container?
정답: D
A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?
정답: D
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?
정답: C
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?
What should the consultant do to verify that Foundation has completed successfully?
정답: A