A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?

정답: B
After a consultant runs Foundation, the imaging process fails.
In which two locations can the consultant find the logs? (Choose two.)

정답: C,D
Refer to the exhibit.

A consultant is deploying a cluster using the customer-provided IP addressing information.
Which option in Foundation must be configured to ensure connectivity during the deployment?

정답: D
A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available Which two Hyper-V features can be used to meet the requirements? (Choose two.)

정답: C,D
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?

정답: D
After a recent installation using a flat switch, a consultant notices issues migrating the Nutanix nodes to the customer's network. The customer states that they are using VLANs on the production switch but not on the dedicated switch for IPMI. The customer does not require a manual configuration of the host and CVM.
What network changes need to be made to correct the issues?

정답: A
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?

정답: A
Refer to the exhibit.

A consultant is installing AOS 5.10 and ESXi 6.5 on three nodes. During the Foundation process, ESXi 6.5 is not available as one of the choices for hypervisor.
Which solution should the consultant use?

정답: C