Changes made to the contract documents during the bid (tender) process are documented in a(n)
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
A designer is working on a joint venture project with a local engineering firm for a large university project.
What drawing system will BEST incorporate coordination of project information?
What drawing system will BEST incorporate coordination of project information?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
What is the MOST critical aspect of an existing building to check before locating library shelving and densely packed filing cabinets?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
What is the PRIMARY benefit for incorporating a design firm?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
At the time of preparing construction documents, the client is undecided about replacing flooring within the scope of work. How would the designer obtain pricing for including the flooring?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The conservation of water through landscaping with native plants and mulching is called
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Contract documents serve as the legal contract between
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
In order for a building permit to be issued, what MUST be completed?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
A building code official has declined to issue a building permit for a project. The official explains that the plans and specifications do not meet code in terms of partition fire ratings and finishes. In order to keep the project on schedule, what would be the FIRST step in dealing with the problem?
정답: D