In ICNV. How database operations synchronized between the source and the target table?

정답: B
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

정답: A
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

정답: A
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

정답: B,D
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

정답: C
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

정답: A,C