최신 C_HANATEC_17 무료덤프 - SAP Certified Technology Associate - SAP HANA 2.0 SPS05

Which target database does the SUM databases migration option provide by default? Note: There are 2 correct answers.

정답: C,D
What is the first node limit for planning an SAP S/4HANA scale-out system? There are 2 correct answers to this question.

정답: C,D
How can you use the results from a comparable the run to optimize the database migration option (DMO) procedure downtime for a production system?
There are 2 correct answers to this question.

정답: A,C
The design-time version of a security role can contain which of the following information? There are 2 correct answers to this question.

정답: A,C
How can you ensure that a consistent database status is saved using data snapshots? Please choose the correct answer.

정답: B
Which operating system process takes care of starting the SAP HANA database system services?
Please choose the correct answer.

정답: D
You administer a single-host system with 100GB physical memory. The global allocation limit and the individual service allocation limit are set to 90%. Three services are running-Service 1 has 25 GB of memory allocated and service 2 has 40 GB allocated. What is the effective allocation limit of service 3?

정답: C
Which preparation tasks do you need to perform before starting the Database Migration Option (DMO) procedure? There are 2 correct answers to this question.

정답: B,D
When you use the database migration option reset procedure as a fallback scenario, which of the changes made during the migration are NOT reset? There are 3 correct answers to this question.

정답: A,C,E
Which administration tool can you use to start and stop the SAP HANA database system?

정답: D

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기