최신 CDCS 무료덤프 - EXIN EPI Certified Data Centre Specialist

The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°F.
Taking energy efficiency as the highest priority, which cooling system should you recommend?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
When are the wet bulb and dry bulb temperatures identical?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:
* Rated power: 30 kVA
* Rectifier input voltage: 400 V/3 phase
* Rectifier input power factor: 0.8
* Battery rated voltage: 384 V
* Number of cells: 192
* End of discharge voltage: 308 V
* Inverter output voltage: 400 V/3 phase
* Inverter output power factor: 0.8
What information is missing to perform the battery calculation?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
When installing a raised floor, can we use a spirit level bar to level the floor?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
In which stage of the data center life cycle does commissioning take place?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기