최신 API-510 무료덤프 - API Pressure Vessel Inspector

Which factor is not considered when determining the inspection intervals for pressure vessels according to API-510?

정답: C
An internal inspection is required on above the ground 'Lower-risk' vessels:

정답: D
An in-service vessel is being repaired or altered.
If there is a conflict between the requirements of API 510 and the legal jurisdiction, which should be followed?

정답: A
According to API-510, which of the following is not a typical method for detecting under-insulation corrosion?

정답: C
When the half bead or temper bead technique of repair is proposed, the first consideration that must be given should be;

정답: C
According to API-510, which is not a recognized method for determining the thickness of a pressure vessel?

정답: B
When a vessel is to be entered for an internal inspection which of the following precautions should be observed?

정답: B
What is the required action under API-510 if a pressure vessel shows signs of significant deterioration before the next scheduled inspection?

정답: B
Describe the requirements and procedures outlined in API-510 for upgrading or modifying pressure relief systems on existing vessels.
정답:
Upgrading or modifying pressure relief systems under API-510 requires a thorough analysis to ensure that the new system meets the current operating conditions and safety standards. This includes recalculating the required capacity of relief devices, verifying the materials of construction for compatibility with the contents and conditions, and performing pressure tests after installation to confirm the system's effectiveness.
Explain how API-510 standards guide the emergency response protocols for pressure vessel failures.
정답:
API-510 provides comprehensive guidelines for emergency response protocols in the event of pressure vessel failures, ensuring quick and effective actions to mitigate risks. These protocols include immediate shutdown procedures, the isolation of the affected area, and rapid depressurization of the vessel if safe to do so. Emergency response also involves notifying all relevant personnel and initiating an evacuation if necessary. Following initial emergency procedures, API-510 requires a thorough investigation to determine the cause of the failure, documentation of the incident, and implementation of preventive measures to avoid future occurrences.