최신 1Z0-1075-26 무료덤프 - Oracle Manufacturing Cloud 2026 Implementation Professional

Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

정답: B,C,E
설명: (DumpTOP 회원만 볼 수 있음)
A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.
What is the reason for this?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

정답: E
설명: (DumpTOP 회원만 볼 수 있음)
A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기