Which of the following statements are true?
I. Early test planning and later test execution is an activity of sequential software development model
II. Change and configuration management are not needed for software testing activities.
III. Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV. System test planning and project planning could occur concurrently in V-model.
I. Early test planning and later test execution is an activity of sequential software development model
II. Change and configuration management are not needed for software testing activities.
III. Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV. System test planning and project planning could occur concurrently in V-model.
정답: D
The main Objective of Test Analysis and Design phase is to;
정답: C
Test Strategy;
정답: C
Select the correct statement;
정답: D
Select the correct statement(s). According to the ISTQB Syllabus;
I. Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing.
II. Fallback, backup and restore activities are part of recoverability testing.
III. Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing.
IV. Verifying whether a system can "meet future efficiency requirements" is called scalability testing
I. Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing.
II. Fallback, backup and restore activities are part of recoverability testing.
III. Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing.
IV. Verifying whether a system can "meet future efficiency requirements" is called scalability testing
정답: B
What is NOT an objective of using a Test Execution Tool?
정답: A
Integrated Solutions Inc. is a software testing company with 20 testers. One of their clients provided a software release and requested to test the software within 2 weeks. The client did not provide any specifications of the software or any documentation. However, Integrated Solutions Inc. testers have tested similar releases from the same client in the past. As a Senior Software Tester, what is your best approach?
정답: A
What type of a review meeting is described below? "You were invited to attend a meeting next week. Meeting moderator included set of metrics and a document to be reviewed along with the meeting agenda. One of the meeting agendas is to find defects in the document sent. You and the other attendees were asked to review the document prior to the meeting".
정답: B