A crew of electricians is needed to run 1,000 feet of conduit, and the estimator determined that two electricians could complete the job in an eight-hour day. What is the required productivity rate per person for the conduit install?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
What type of written or visual communication is NOT appropriate on the work site?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Insured costs for occupational injuries or deaths include which of the following?
정답: D