최신 CTAL-TM-001 무료덤프 - ISTQB Certified Tester Advanced Level - Test Manager
Which of the followingis a factor that is likely to increase the test estimate?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
In an Agile project, when Is it acceptable lo not write a formal defect report when a defect is found''
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
If you are monitoring code coverage during testing to determine what areas still need testing what type of testing is likely occurring?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
You have just conducted a skills assessment for your team. You decided to rate everyone from 1 to 5 in the skill areas as follows:
5 = expert
4 = proficient
3 = can use this skill effectively but will need some assistance
2 = interested in learning this skill but has only minimal knowledge
1 = not interested in learning this skill
Given these values, you have rated your team as shown in the table below for the designated skill areas:

You will be starting to test a new product that is an upgrade from one of your existing end user products.
Your testing will include white box,
performance, security, usability, and black box. You also have a goal to automate 100% of the smoke test and
50% of the regression tests by the end of the release.
Your team willingly shares knowledge and conducts regular lunch time cross-training sessions.
Your manager wants to know if you would like to bring in someone to help train your team in preparation for this project. In which area could you best utilize this help? [3]
5 = expert
4 = proficient
3 = can use this skill effectively but will need some assistance
2 = interested in learning this skill but has only minimal knowledge
1 = not interested in learning this skill
Given these values, you have rated your team as shown in the table below for the designated skill areas:

You will be starting to test a new product that is an upgrade from one of your existing end user products.
Your testing will include white box,
performance, security, usability, and black box. You also have a goal to automate 100% of the smoke test and
50% of the regression tests by the end of the release.
Your team willingly shares knowledge and conducts regular lunch time cross-training sessions.
Your manager wants to know if you would like to bring in someone to help train your team in preparation for this project. In which area could you best utilize this help? [3]
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of statement about defect management is TRUE?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
An old stock control system is being decommissioned and replaced with a new system that has been running successfully in the live environment for the last few months. The stakeholders would like to -
* retain historical information held in the database to comply with their data retention policy (which requires order information to be retained for 7 years)
* query the historical information by running pre-written SQL queries.
* all commands must be invoked by keyboard as one of the end users is unable to use a mouse The pre-written SQL queries will be designed, developed and tested by the developers who are decommissioning the system and writing the data migration routine.
As the system to be decommissioned is integrated to other systems that will remain operational, the stakeholders have requested that testing incorporates all systems that are part of the stock control suite.
The stakeholders and project manager have identified the following risks, in priority order -
* 1st - Data has not been successfully migrated to an archived data store, resulting in the inability to query past stock levels and re-order details.
* 2nd - Historical data for the last 7 years is unavailable, resulting in the failure to meet the data retention policy.
* 3rd - Failure of existing systems within the stock control suite, adversely affecting the operational running of the business The risks are to form the basis of the test objectives. Which three of the following test activities, work products and/or resources achieves the test objectives?
a. Use of the live database to test the data migration does not corrupt or lose data b. A test plan detailing the test approach for ST. SIT & OT test levels c. Accessibility testing of the pre-defined SQL queries d. Security and Penetration testing of the archived database e Performance testing of the data migration exercise to ensure it completes in the time specified by the stakeholders f. Functional testing of the pre-defined SQL queries g. Regression testing of the end to end process for maintaining specified stock levels.
* retain historical information held in the database to comply with their data retention policy (which requires order information to be retained for 7 years)
* query the historical information by running pre-written SQL queries.
* all commands must be invoked by keyboard as one of the end users is unable to use a mouse The pre-written SQL queries will be designed, developed and tested by the developers who are decommissioning the system and writing the data migration routine.
As the system to be decommissioned is integrated to other systems that will remain operational, the stakeholders have requested that testing incorporates all systems that are part of the stock control suite.
The stakeholders and project manager have identified the following risks, in priority order -
* 1st - Data has not been successfully migrated to an archived data store, resulting in the inability to query past stock levels and re-order details.
* 2nd - Historical data for the last 7 years is unavailable, resulting in the failure to meet the data retention policy.
* 3rd - Failure of existing systems within the stock control suite, adversely affecting the operational running of the business The risks are to form the basis of the test objectives. Which three of the following test activities, work products and/or resources achieves the test objectives?
a. Use of the live database to test the data migration does not corrupt or lose data b. A test plan detailing the test approach for ST. SIT & OT test levels c. Accessibility testing of the pre-defined SQL queries d. Security and Penetration testing of the archived database e Performance testing of the data migration exercise to ensure it completes in the time specified by the stakeholders f. Functional testing of the pre-defined SQL queries g. Regression testing of the end to end process for maintaining specified stock levels.
정답: A
While mining the defect database for patterns of problems in the last release, a Test Manager notices that many of the most damaging failures were caused by defects injected during the low-level design phase.
Which of the following actions will likely give this project the most effective solution to this problem? [3]
Which of the following actions will likely give this project the most effective solution to this problem? [3]
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
You are Test Manager for a project which is in the Test Implementation stage for the first planned iteration, creation of the initial Test Cases and required test data is progressing well.
The Test Strategy documents the Stakeholders view that small teams should collaborate together to create and test functionality which is to be released in iterations, with each release building on the success of the last.
Stakeholders are willing to accept the risks of a partly working system in the early stages. Delivery of working functionality (particularly around interfaces to third party systems and performance of back end databases) is the priority for the early releases.
Which of the following test types would you select for this first planned iteration, in order to meet Stakeholders expectations?
a) Usability testing
b) Structural testing
c) Functional testing of process flows
d) Performance testing
e) Business process testing
f) Component integration testing
You are Test Manager for a project which is in the Test Implementation stage for the first planned iteration, creation of the initial Test Cases and required test data is progressing well.
The Test Strategy documents the Stakeholders view that small teams should collaborate together to create and test functionality which is to be released in iterations, with each release building on the success of the last.
Stakeholders are willing to accept the risks of a partly working system in the early stages. Delivery of working functionality (particularly around interfaces to third party systems and performance of back end databases) is the priority for the early releases.
Which of the following test types would you select for this first planned iteration, in order to meet Stakeholders expectations?
a) Usability testing
b) Structural testing
c) Functional testing of process flows
d) Performance testing
e) Business process testing
f) Component integration testing
The Test Strategy documents the Stakeholders view that small teams should collaborate together to create and test functionality which is to be released in iterations, with each release building on the success of the last.
Stakeholders are willing to accept the risks of a partly working system in the early stages. Delivery of working functionality (particularly around interfaces to third party systems and performance of back end databases) is the priority for the early releases.
Which of the following test types would you select for this first planned iteration, in order to meet Stakeholders expectations?
a) Usability testing
b) Structural testing
c) Functional testing of process flows
d) Performance testing
e) Business process testing
f) Component integration testing
You are Test Manager for a project which is in the Test Implementation stage for the first planned iteration, creation of the initial Test Cases and required test data is progressing well.
The Test Strategy documents the Stakeholders view that small teams should collaborate together to create and test functionality which is to be released in iterations, with each release building on the success of the last.
Stakeholders are willing to accept the risks of a partly working system in the early stages. Delivery of working functionality (particularly around interfaces to third party systems and performance of back end databases) is the priority for the early releases.
Which of the following test types would you select for this first planned iteration, in order to meet Stakeholders expectations?
a) Usability testing
b) Structural testing
c) Functional testing of process flows
d) Performance testing
e) Business process testing
f) Component integration testing
정답: D
What is the purpose of tracking efficiency metrics for a formal review?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following Is a way in which risk analysis drives test analysis?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
You have directed one of your testers to construct a "smoke test" to execute against new builds prior to starting formal testing. This is an example of which software development lifecycle activity?
[1]
[1]
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Your company has adopted an Agile methodology. Defect reports are not raised for all bugs found during the testing of individual stories, but continue to be raised in some circumstances, e.g., when the fix cannot be made immediately, or would involve another team. The teams would like better data to use for assessing the quality of their work. The list below shows five items that are currently not captured on defect reports.
Which TWO of these items will be MOST useful for assessing the quality of a product increment?
Which TWO of these items will be MOST useful for assessing the quality of a product increment?
정답: A,D
설명: (DumpTOP 회원만 볼 수 있음)
You are looking to Improve the efficiency of testing. The developers have been claiming that the majority of defect reports they receive are invalid either due to the test environment or because the tester did not follow the right steps In a standard defect management process where should you look for more information about these invalid defects?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
As the Test Manager working for a company developing safety related software for defence equipment, you have been asked to consider how you can track test progress and report on the following:
1) Test cases adequately cover all requirements
2) Issues relating to safety critical vulnerabilities are being addressed in priority order
3) How much of the developed system has been exercised through testing What tools would help to achieve this?
SELECT ONE OPTION
1) Test cases adequately cover all requirements
2) Issues relating to safety critical vulnerabilities are being addressed in priority order
3) How much of the developed system has been exercised through testing What tools would help to achieve this?
SELECT ONE OPTION
정답: A
When, at a minimum, should project risks be re-evaluated?
정답: C